Project 1 Case Study—Gap Analysis Read the following 2002 article: Merging IT at DaimlerChrysler

Asked by nerdygirl
Dated: 19th Apr'15 04:52 AM
Bounty offered: $19.00


Project 1 Case Study—Gap Analysis


Read the following 2002 article: Merging IT at DaimlerChrysler (This company no longer exists, but for the purposes of this course, we will consider this to be a current situation.)

Using the gap analysis template provided in Course Content, determine where technology gaps exist within the candidate infrastructure. Order and define these technology gaps in a logical and concise manner for analysis.


Step 1: Determine the application or technology and related sub-elements under evaluation—at least 10 items should be derived from the case study.

Step 2: Based on the information provided in the case study, document how the application under evaluation is performing. Include any issues or problems.

Step 3: What timeline is expected? Provide estimates regarding expected/needed implementations, with rationale.

Step 4: Describe how the application will operate after the indicated issues have been addressed. Describe the optimal state of the application, and highlight the differences between the "as is" and "to be" states within the candidate infrastructure.

Step 5: Provide a high-level recommendation regarding the next steps to take in making the effort to close the gap. Also, describe and prioritize the risks associated with moving to the "to be" state.


The deliverable for this case study assignment will be a fully completed template, one-to-two pages in length.

Project 1 Case Study—Gap Analysis Read the following 2002 article: Merging IT at DaimlerChrysler
Answered by nerdygirl
Expert Rating: 200 Ratings
Dated: 19th Apr'15 04:52 AM
240 words and 1 attachment(s).
Tutorial Rating: Not Rated
Sold 0 times.
(preview of the tutorial; some sections have been intentionally blurred)
…to     costs,   quality and     and       from     At     combined       CATIA   or CAM     overcome       shortage   the late…

attachments

Gap Analysis DaimlerChrysler.doc
Preview of Gap Analysis DaimlerChrysler.doc
squeeze     boost   through the     IT       performance   two companies     bringing       was   primary task     companies       purpose,   engaged CIO     (Unger),       US200   million and     use       initiatives   to reduction     boost       productivity   eventually recovered     bankruptcy       combined   software, IBMs     or       overcome   acute labor     the       early   Through CATIA,