QSO300 Final Project Milestone Two

Asked by bizgrad
Dated: 10th Aug'18 07:48 AM
Bounty offered: $25.00

Southern New Hampshire University

QSO 300 Final Project Milestone Two Guidelines and Rubric

Overview: For the second milestone of your final project, you will submit a quality, process, and location analysis case study analysis that will address the

typical problems that operations managers face. This case study analysis will be incorporated into the final summative analysis. This milestone is due in Module

Four.

Prompt: Refer to the Nissan case study, your own independent research, and the course materials to answer the following items. Specifically, the following

critical elements must be addressed:

I. Theories and Techniques

A. Explain the five steps of the theory of constraints (TOC) process. To what processes might the company in the case study apply TOC? Why would

applying TOC to these processes be advantageous’

B. Describe how total quality management (TQM) principles and tools can be used to improve quality in the latest line of products in the context of

the case study.

II. Data Analysis

A. Draw a cause-and-effect diagram that assesses why some of the company's supply chain partners might have struggled to implement some of the

company’s newly developed materials. Summarize your findings from the diagram.

B. Draw a hypothetical process (time-function) map for producing a recently released (within the past two years) product manufactured by the

company. As an operations manager, how will you use the value map? Be sure to include your process map within your case study analysis.

C. Considering the data and options below, determine where the company should locate its new manufacturing plant. Explain why this would be

the favorable location.

Factor Weight Mexico City Columbia, SC

Political Risk .25 70 80

Transportation Costs .20 40 90

Labor Productivity .20 85 75

Rental Costs .15 90 55

Labor Costs .10 80 50

Taxes .10 90 50

Guidelines for Submission: The format for this assignment will be a Word document using a business writing format of your choice. There is no minimum page

length requirement, but the submission should be double spaced, and no more than four pages in total. Copy and paste any data analysis from Excel into your

Word document for submission. You may include your original Excel documents as supplementary material if you believe this will strengthen your contribution.

QSO300 Final Project Milestone Two
Answered by bizgrad
Expert Rating: 2385 Ratings
Dated: 10th Aug'18 07:48 AM
5 words and 1 attachment(s).
Tutorial Rating: Not Rated
Sold 0 times.
(preview of the tutorial; some sections have been intentionally blurred)
…refer…

attachments

milestone-2-correctedcopy.docx (69.63 KB)
Preview of milestone-2-correctedcopy.docx
can     ranging   the nature     to       of   business and     Develop       overcoming   constraints identified-This     making       to   throughput of     constraint       first   (Tibben-Lembke, 2014)     uses       to   the constraint     step       the   of what     In       will   up with     on       out   its existing     get       This   help to     the       without   Subordinate everything     involves       factors   the process     that       in   and well     the       specific   identified in     step       the   that are     be       kind   setting that     identified       at   maximum level     (Tibben-Lembke,       have   supply division     production       plan   reach out     the       focus   obtaining the     Elevating       involves   more effort     the       considering   further actions     be       the   into a     2014)       even   additional capital     and       the   is eliminated     case       can   for alternatives     other       supply   missing parts     work       Nissan   also invest     multiple       that   are never     any       divisions   the process-This     at       an   Therefore, once     constraint       the   should be     ensure       that   be present     (Tibben-Lembke,       when   has been     restore       for   part that     it